Corrigendum |

Corrigendum to: A Ford-Based Branch-and-Bound with Minimum Cut Lower Bounds for the Resource-constrained Project Scheduling Problem

Published: 24 November 2026
Views:       Downloads:
The Original Version for this article was published in Mathematics and Computer Science https://doi.org/10.11648/j.mcs.20261104.11
Published in Mathematics and Computer Science (Volume 11, Issue 6)
DOI 10.11648/j.mcs.20261106.12
Page(s) 137-141
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2026. Published by Science Publishing Group

Cite This Article
  • APA Style

    Bah, H. K., Baldé, A. O., Bah, I., Diakhaby, A. (2026). Corrigendum to: A Ford-Based Branch-and-Bound with Minimum Cut Lower Bounds for the Resource-constrained Project Scheduling Problem. Mathematics and Computer Science, 11(6), 137-141. https://doi.org/10.11648/j.mcs.20261106.12

    Copy | Download

    ACS Style

    Bah, H. K.; Baldé, A. O.; Bah, I.; Diakhaby, A. Corrigendum to: A Ford-Based Branch-and-Bound with Minimum Cut Lower Bounds for the Resource-constrained Project Scheduling Problem. Math. Comput. Sci. 2026, 11(6), 137-141. doi: 10.11648/j.mcs.20261106.12

    Copy | Download

    AMA Style

    Bah HK, Baldé AO, Bah I, Diakhaby A. Corrigendum to: A Ford-Based Branch-and-Bound with Minimum Cut Lower Bounds for the Resource-constrained Project Scheduling Problem. Math Comput Sci. 2026;11(6):137-141. doi: 10.11648/j.mcs.20261106.12

    Copy | Download

  • @article{10.11648/j.mcs.20261106.12,
      author = {Hawa Kaba Bah and Amadou Oury Baldé and Ibrahima Bah and Aboubakary Diakhaby},
      title = {Corrigendum to: A Ford-Based Branch-and-Bound with Minimum Cut Lower Bounds for the Resource-constrained Project Scheduling Problem},
      journal = {Mathematics and Computer Science},
      volume = {11},
      number = {6},
      pages = {137-141},
      doi = {10.11648/j.mcs.20261106.12},
      url = {https://doi.org/10.11648/j.mcs.20261106.12},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.mcs.20261106.12},
      abstract = {},
     year = {2026}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Corrigendum to: A Ford-Based Branch-and-Bound with Minimum Cut Lower Bounds for the Resource-constrained Project Scheduling Problem
    AU  - Hawa Kaba Bah
    AU  - Amadou Oury Baldé
    AU  - Ibrahima Bah
    AU  - Aboubakary Diakhaby
    Y1  - 2026/11/24
    PY  - 2026
    N1  - https://doi.org/10.11648/j.mcs.20261106.12
    DO  - 10.11648/j.mcs.20261106.12
    T2  - Mathematics and Computer Science
    JF  - Mathematics and Computer Science
    JO  - Mathematics and Computer Science
    SP  - 137
    EP  - 141
    PB  - Science Publishing Group
    SN  - 2575-6028
    UR  - https://doi.org/10.11648/j.mcs.20261106.12
    AB  - 
    VL  - 11
    IS  - 6
    ER  - 

    Copy | Download

Author Information
  • West African Institute of Mathematics, Gamal Abdel Nasser University, Conakry, Guinea

  • Mathematics Department, Abdel Nasser University, Conakry, Guinea

  • Mathematics Department, Abdel Nasser University, Conakry, Guinea

  • West African Institute of Mathematics, Gamal Abdel Nasser University, Conakry, Guinea

  • Sections